RLL-620-3RS/3RSNB/3RSSF/3RSTR- OO Gauge Diesel Depot 3 Road Kit Fitting Instructions
PLEASE NOTE – SOME PARTS OF THIS LASER KIT ARE VERY FRAGILE – HANDLE WITH CARE!
Introduction
Welcome to our video tutorials on how to build the above kits. Please check your kit for all parts prior to building and read the instructions. These are included in the kit and listed below for each video tutorial.
Please take your time in building this kit and we recommend doing it over a few evenings or weekends and at the end of the tutorials. you will have made your depot kit.
Enjoy.
NB: Instructions last updated: 01/12/2018
part one – base fitting
BASE FITTING INSTRUCTIONS (FOR RLL-620-3RS ONLY)
part two – Priming
Get the skeleton framework of the kit; two side panels, rear end panel, depot front panel and the two roof panels and primer the insides of each section.
PLEASE NOTE: The side panels – the side entrance door should be at the depot entrance of the shed on BOTH sides. The roof cross members will NOT fit to the base if you get this around the wrong way! (applicable to the full kit with base)
We used a grey primer (Halfords Car Primer) for the internal walls but it can be painted in a different colour if preferred. Allow to dry, then lightly sand to give the next coat a key. 2-3 additional coats in total should be enough.
(Optional – Once fully dried, you can give the internal walls a light sanding.)
Do not sand the internal sections of the roof panels as this will give grip to the depot edge when placing the roof on and stop it sliding (unless of course, you are gluing these in place)
Where the holes are in the side panels, end panel and depot door panel, for other parts of the kit to fit into, you may need to use a small file to get rid of any paint that may have decreased the size of the gap during painting, as all parts are a snug fit….. PLEASE TEST!
part three – Priming
Prime all roof trusses in the colour of your choice. The best option here is to add some masking tape to the insets of the down supports to stop paint getting on them and then stick them down on a flat surface and use the tape to stick to the surface. This way, when spraying them, they won’t blow away! Allow to dry and then repeat the process on the other side. However, the two end roof trusses will only need spray priming on one side as the other side will be glued to the end section. Also, the depot door end section will require the diagonal support bars to be cut to allow it to fit around the edge of the end top boxes, so cut these with a sharp craft knife. You may then need to lightly sand around the cut off section on the frame/down support to make it smooth and then put the primer on. Allow to dry fully before assembling to end sections.(We’ll be fitting these a bit later on)
part four – Roof Framing
part five – Making Interior Pack
*****RLL-620-3RSTR Through Road Kit – Simply duplicate Videos 5, 6, 7 and 12 for both ends of the depot*****
Make up the internal depot door side panels and top boxes. The side panels fit A to A , B to B and C to C. Use a nice piece of straight wood to rest these parts against to give them their 90 degree angles. These bits are fiddly, especially the sides of the top boxes , so you may need to hold the sections, then add the small end pieces, then glue them. Once rested against the piece of wood, add some more glue with a small brush and allow to dry. You may want to use a sanding block to give the top boxes a light sanding. Paint the top boxes, (we used a metallic silver acrylic paint). Give the top boxes a couple of coats if required. Then paint the door side runners. We used yellow, but could be painted in any colour of your choice. Allow to dry. It may also pay to paint the roof cross members at this point. They are only 2mm square but long and are VERY FRAGILE , so may be tricky to paint, so you could tape the ends down to a flat surface with a small amount of masking tape and spray/brush. (similar to what we did when priming the roof trusses). Allow to dry.
part six – interior Pack
You will need to paint these both sides as they will show. Once dry, add a small amount of glue to the insides of the top box and side runners (be careful not to glue too far down). You may find that with the addition of paint on these door rollers, they may simply slide up the runners and stay there, so may not require gluing. You could also then swap them around from time to time to change the look!
part seven – Roof trusses
Apply a small amount of glue on the under-side of the roof truss and then gently move into place, using the tops of the top boxes as a rest, you can move the truss to match the edge of the end panel and the sides of the roof. Make sure the side supports fit EXACTLY over the end panel as the side panel will be pushed into place and if it is out of alignment, it will not fit. You can offer up the side panel to check. Allow to dry.
part eight – Roof Trusses
part nine – Cross members
PLEASE NOTE! THESE WILL ONLY FIT ONE WAY, so make sure you check first.
Having previously marked where you are putting the middle two members, offer these up as previous two. DOUBLE CHECK YOU HAVE NOT FITTED THESE IN THE WRONG PLACE AND THEY SHOW THROUGH THE ROOF WINDOWS!
Use the metal rule to align straight. Allow to dry.
part ten – Cladding
**TIP** We have now found it better to glue the skeleton frame rather than the card. We explain it in the video.
part eleven – Edgings
part twelve – Finishing
Congratulations
You have now completed the 3 road depot kit. We hoped you enjoyed making this kit and it is now time for you to add all your own relevant depot pieces inside the shed and to weather the shed should you wish. As the exterior of this shed is of card (exc. RLL-620-3RS/SF kit), before doing any weathering, we recommend a coat of matt varnish to seal the card. You can then add your own weathering powders etc.
We’d love to see your depot on your layout.
Send some photographs to:-
We could even feature them on our web site at some point.
REF/RLL6203RS/3RSNB/3RSSF/3RSTR – Updated 01/12/2018
Not Yet Purchased Our OO Gauge 3 Road Diesel Depot? - Click here to buy now!